-
3 Stars Hotels, Tent Camping
-
Jan, Feb, Mar, July, Aug & Sept
-
English, Spanish, French, Chinese
-
5895 Metres
-
All meals during the trek
-
2 to 20 People
-
Kilimanjaro (JRO)
-
Easy to Moderate
-
Moshi
-
Moshi
-
12
-
82
Trip Overview
The Rongai Route is the only trail that starts from the Northern part side of Mt. Kilimanjaro. Despite some claims that this route begins on the “Kenyan side” of Mount Kilimanjaro, the whole of Africa’s highest mountain is within the borders of Tanzania. The start of the Rongai route is closer to the Kenyan border than other routes, but the entire trek takes place exclusively in Tanzania.
Because of its remote location, the route receives the least traffic of all the routes on Kilimanjaro and offers trekkers a relatively unspoiled wilderness experience where it is possible to see large wildlife like antelope, elephants, and buffalo.
The North-East side of the mountain gets significantly less moisture than the southern slopes which means that trekkers are less likely to encounter rain. Trekkers are also more likely to get clear, unclouded mountain views.
The Rongai Route is flatter than the other Kilimanjaro routes but because of its profile, it does not offer trekkers good options to climb high and sleep low.
It can be hiked on a six, seven, or even eight-day route. The seven or eight-day Rongai Routes are highly recommended as trekkers have extra days to acclimatize. Summit night from Kibo Hut is steep and follows the same path taken by Marangu trekkers which passes Gilman’s Point to Uhuru Peak. Then descends via the Marangu trail.
Tour Highlights
- Departure and Return Place: Moshi Town to Rongai Gate and then back to Kilimanjaro International Airport (Google Map)
- Departure Time: Please be ready by 8:15 AM for a prompt departure at 9:30 AM.
- Return Time: Approximately 10:30 AM on the last day.
- Dress Code: Casual. Comfortable athletic clothing, hiking shoes, hat, cold weather jacket, gloves, pants, and spare clothing.
- Accommodation: Two nights of accommodations based on Bed and Breakfast at 3 stars hotel (upgrades on request).
- Customizations: Can be customized upon request, to meet traveller’s needs
- Extensions: Trip Extensions are available on request.
- Trip Availability: All year round.
Trip Highlights
- Arrival
- Day 1: Rongai Gate (1950m) – 1st Caves Camp (2600m)
- Day 2: 1st Caves Camp (2600m) – Kikelewa Cave (3600m)
- Day 3: Kikelewa Cave (3600) – Mawenzi Tarn Camp (4330m)
- Day 4: Mawenzi Tarn Camp (4330m) – Kibo Hut (4700m)
- Day 5: Summit Attempt Kibo Hut (4700m) – Uhuru Peak (5895m) – Horombo Hut (3720m)
- Day 6: Horombo Hut (3720m) – Marangu Gate (1980m)
- Departure